中文版     ENGLISH 
    News
    Contact UsMore>>
    Shenzhen Baiqiancheng Electronic Co.,Ltd.(BQC)
    Address:No.343,Changfeng Road,Changzhen Community, Guangming New District,Shenzhen,Guangdong Province, China 518132
    Tel:86-0755-26788241
    Fax:86-0755-26788245
    Industry NewsNews > Industry News > What are the operating requirements for PCBA conformal coating?    

    What are the operating requirements for PCBA conformal coating?

    Hits:1  Add Date:2021/6/25

    1.The coating work of the conformal coating should be carried out in a separateroom, but it should not be completely airtight, and there must be goodventilation facilities.

    2.Smoking, eating and drinking are prohibited in the operation room, andalcoholic beverages should not be used before work.

    3.Wear masks or gas masks, rubber gloves, chemical protective glasses and otherprotective equipment during operation to avoid harm to the body. This alsodepends on the selected three-proof paint product. If it contains stupidproducts, pay great attention to protection. And fireproof, and if it is aTIS-NM environmental protection conformal coating product, the safety is muchhigher and there is no risk of burning.

    4.After the work is finished, clean the used utensils in time, arrange and testtools and equipment, and cover tightly the container with the conformal coating.

    5.The workplace should be clean and dust-free, and there should be no flyingdust, and irrelevant personnel should be prohibited from entering.

    6.Tools and equipment should be fully grounded, and electrostatic protectionmeasures should be taken.

    7.Do not overlap PCBA during operation; PCB boards should be placed horizontally.

    8.Before using each batch of raw materials, a small sample curing test (3-5PCS)should be done.

    9.Clean and bake the board to remove moisture and moisture. The dust, moistureand oil on the surface of the object to be coated must be removed first, sothat it can give full play to its protective effect. Thorough cleaning canensure that the corrosive residues are completely removed, and make the conformalcoating adhere to the surface of the circuit board well. Drying conditions: 60<span style=""font-size:12.0pt;font-family:宋體;mso-ascii-font-family:"Times New Roman";">°C, 10-20 minutes,take it out of the oven and apply it while it is hot, the effect will be better.

     

    PCB Assembly, PCBA Contract Manufacturing, Electronic Manufacturing Services Provider, Electronic OEM/ODM services,PCBA OEM/ODM, Full Turnkey Manufacturing,
    Box Build.SMT Assembly, China CM factory, China Contract Manufacturing Supplier, China PCBA supplier, China PCBA factory
    主站蜘蛛池模板: eeuss影院在线观看| 污到流水的视频| 看全色黄大色黄女片18女人| 最近免费中文字幕大全视频| 天天摸天天做天天爽| 国产黄色片91| 又大又黄又粗又爽视频| 久久精品国产一区二区三| 99久久99久久免费精品小说| 美女视频黄a视频全免费网站色| 果冻传媒mv在线观看入口免费| 在线播放免费播放av片| 国产18禁黄网站免费观看| 五月婷婷电影网| 94久久国产乱子伦精品免费| 精品久久久影院| 成年免费a级毛片| 国产三级日产三级韩国三级韩级 | 成人18网址在线观看| 国产大陆xxxx做受视频| 亚洲免费在线看| 91精品啪在线观看国产线免费| 男男车车的车车网站免费| 大陆一级毛片免费视频观看 | 亚洲人成www在线播放| 99久久精品费精品国产| 毛片免费全部无码播放| 国产精品天天在线午夜更新| 亚洲成人在线免费观看| 91最新地址永久入口| 欧美乱人伦视频| 国产精品27页| 亚洲va久久久噜噜噜久久| 巨胸流奶水视频www网站| 欧美日韩国产网站| 国产香蕉一区二区三区在线视频| 亚洲美女视频免费| g0g0人体全免费高清大胆视频| 毛片a级毛片免费观看品善网| 国产精品99久久久精品无码| 久久国产精品免费视频|