中文版     ENGLISH 
    News
    Contact UsMore>>
    Shenzhen Baiqiancheng Electronic Co.,Ltd.(BQC)
    Address:No.343,Changfeng Road,Changzhen Community, Guangming New District,Shenzhen,Guangdong Province, China 518132
    Tel:86-0755-26788241
    Fax:86-0755-26788245
    Industry NewsNews > Industry News > DIP plug-in considerations    

    DIP plug-in considerations

    Hits:1  Add Date:2020/3/24

    DIPplug-in post-welding processing is a process after SMT chip processing, and theprocessing process precautions are as follows:

     

    1.Pre-processing of components

    Thestaff of the pre-processing workshop picks up the materials from the BOMaccording to the BOM bill of materials, carefully checks the material model andspecifications, signs, and performs pre-processing according to the model(using automatic bulk capacitor shears, transistor automatic molding machine,fully automatic belt type Processing equipment such as molding machines).

    Claim:

    The horizontal width of the adjusted component pin needs to be thesame as the width of the *** hole, and the tolerance is less than 5%;

    The distance between the component pins and the PCB pads should notbe too large;

    If the customer requests, the part needs to be formed to providemechanical support and prevent the pad from lifting.

     

    2.Paste high-temperature adhesive tape, enter the board paste high-temperatureadhesive tape, and block the tin-plated through holes and components that mustbe soldered later;

     

    3.DIP plug-in processing workers need to bring electrostatic rings, wearanti-static clothes and hats to prevent static electricity, and perform plug-inaccording to the component BOM list and component bit number diagram. Care mustbe taken when inserting the plug-in.

     

    4.For the inserted components, check them, mainly check whether the componentsare inserted incorrectly or missed;

     

    5.For the PCB board with no problems with the plug-in, the next step is wavesoldering. The wave soldering machine performs automatic soldering processing,which is a firm component.

     

    6.Remove the high-temperature adhesive tape, and then check. In this step, themain inspection is to visually observe whether the soldered PCB board is weldedintact;

     

    7.Repair and repair the PCBs that are found to be incompletely welded to preventproblems;

     

    8.Post-welding, which is a process set for components with special requirements,because some components cannot be directly welded by wave soldering machinesaccording to the process and material limitations, and need to be completedmanually;

     

    9.After all components are soldered to the PCB board, a functional test isperformed to test whether each function is normal. If a functional defect isdetected, repair and test processing is required.

    PCB Assembly, PCBA Contract Manufacturing, Electronic Manufacturing Services Provider, Electronic OEM/ODM services,PCBA OEM/ODM, Full Turnkey Manufacturing,
    Box Build.SMT Assembly, China CM factory, China Contract Manufacturing Supplier, China PCBA supplier, China PCBA factory
    主站蜘蛛池模板: 激情久久av一区av二区av三区| japanesexxxxhd熟睡直播| h在线观看免费| 精品一区二区三区自拍图片区| 最近中文字幕免费4| 在线观看国产精成人品| 国产一级淫片a| 亚洲av第一网站久章草| a级毛片在线观看| 色窝窝无码一区二区三区成人网站| 欧美中文字幕视频| 天天久久综合网站| 君子温如玉po| 久久久久无码中| 成人免费福利视频| 欧美日韩在线视频一区| 无码国产精品一区二区免费模式 | 精品人妻无码专区在中文字幕| 日韩精品一区二区三区毛片| 国产精品香蕉在线观看| 伊人久久精品线影院| 中文字幕一区二区三区永久| 黄色大片在线视频| 欧美午夜性春猛交| 国产精品福利电影| 人人妻人人爽人人澡人人| 中国美女一级毛片| 色综合天天综合高清网国产| 日韩精品无码一本二本三本色 | 欧美日韩亚洲国产一区二区三区| 国产精品国产三级国产普通话a| 亚洲精品自产拍在线观看动漫| 999国产高清在线精品| 狼色精品人妻在线视频免费| 女同午夜三级在线观看| 动漫成年美女黄漫网站国产| 中文字幕在线播放一区| 精品久久久中文字幕| 国产麻豆一精品一av一免费| 亚洲精品国产品国语在线| 99久久综合精品五月天|